KU3241 Installation1 KU3241 User Manual
KU3241 Installation 10 9. Warranty: 9-1 Coverage: Larkooler values the quality and safety of our products, and strict quality control measures ar
KU3241 Installation 2 Content 1 KU3241 Specification P3 2 KU324 Product Components P3 3 Safety Note P4 4 How It Work P4 5 Power Supply
KU3241 Installation3 1.Specifications: Heat Exchange Radiator PUMP 1) Dimension: 310(L)X 124(W)X 35(H)mm 2) Weight:680g 3) Material: Copper
KU3241 Installation 4 3. Safety Notes 1) Read this instruction carefully before installing and running this product. 2) If you are new to the water
KU3241 Installation5 1. Determine the length of the tube required between the Water-Blocks before cutting and connecting the water lines. 2. The end
KU3241 Installation 6 -STEP1- -STEP2- -STEP3- -STEP4- -STEP5- z First, set in the clamp on one end of thetube
KU3241 Installation7 Please disconnect all powers inside the main frame (including hard drives and CD-ROM). Test Run the system for 20 mines, ch
KU3241 Installation 8 8. Completing The System Installation: 8-1 Completion 8-2. Maintenance: We value the reliability and conv
KU3241 Installation9 ●Check if all connections are locked tight.●Check if water line is plugged in correctly, and all bolts and screws are tightly l
Kommentare zu diesen Handbüchern